Project Overview Design Gallery Program HOA Compliance Legal Framework Bid Instructions Request Full Package
CONFIDENTIAL SOLICITATION

Venice Oasis

at Venice Bay Estate

Lots 26 & 27 · Nassau, Bahamas · Direct Waterfront on Miller Sound

5,601 Total Sq Ft
5 BD + Office + 4-Car Garage
18 Month Timeline
Request Full Package →
Scroll to explore
Project Overview

A Shovel-Ready Waterfront Estate

The Owner of Lots 26 and 27, Venice Bay, Nassau, Bahamas invites qualified architects, licensed engineers, and general contractors to submit proposals for the design completion and construction of a luxury waterfront estate.

📍

Location

Lots 26 & 27 (contiguous)
Direct waterfront on Miller Sound
Venice Bay, Nassau, Bahamas

📐

Program

4,006 sq ft living area
5,601 sq ft total covered area
Two-story · 5 BD + Office · 4-Car Garage

🏛

Style

Caribbean Plantation Modern
Standing seam metal roof (dark grey)
Coral stone & stucco · Impact glass

Timeline

18 months from Notice to Proceed
3-phase milestone schedule
Certificate of Occupancy target

💰

Budget

To Be Revalidated
Based on current 5,601 sq ft scope
Itemized SOV required from bidders

📋

Contract Type

AIA A102 — Cost-Plus with GMP
Open-book billing
Lump-sum bids will not be accepted

Pre-Existing Site Preparation — Excluded from This Solicitation

The Owner has entered into a separate agreement with Kempco Development (Trae Kemp) for early site-preparation services on Lots 26 & 27, scoped at $86,750 BSD (Estimate #EST032). This includes clearing, grading, foundation layout, permit drawings, and ministry approval. Bidders shall not include, price, or scope these preliminary services in their proposals.

Room Schedule

4,006 sq ft Living Area

The floor plan is organized to comply with Venice Bay Restrictive Covenants. The great room and kitchen anchor the center, with a second story above. All principal rooms open to the covered veranda or balcony via glazed doors.

Interior — Under Air

Great Room24 × 24 ft, open to above
Dining Room14 × 18 ft
Kitchen14 × 16 ft
Pantry9 × 7 ft
Foyer12 × 14 ft
Master Bedroom18 × 20 ft
Master Bath12 × 13 ft
Master Walk-In Closet12 × 11 ft
Guest Suite13 × 13 ft
Office / Bedroom 313 × 12 ft 9 in
Upper Bedroom 413 × 17 ft
Upper Bedroom 513 × 17 ft
Upper Loft / Lounge12 × 14 ft
Total Living Area4,006 sq ft

Exterior

Garage30 × 24 ft (4 bays)
Covered Veranda14 ft deep
Front Porch8 ft deep
Ocean Balcony8 ft deep
Infinity Pool18 × 36 ft
Total Covered Area5,601 sq ft

Structural Highlights

  • Reinforced CMU construction — 180 mph wind load
  • Impact-rated glazing throughout
  • 3-zone VRF HVAC system
  • 200A service (400A recommended)
  • 1,500-gal cistern backup
  • Pre-wired: Lutron, Sonos, security, automated shading
  • Saltwater infinity pool with automated dosing
Regulatory

HOA Covenant Compliance

All Venice Bay Restrictive Covenant provisions have been confirmed compliant in the current design.

ProvisionRequirementStatus
Article VII, §5Min. 2,000 sq ft exterior floor area✓ COMPLIANT — 4,006 sq ft
Article VII, §620 ft minimum front setback✓ COMPLIANT — 20 ft confirmed
Article VII, §610 ft minimum side setback✓ COMPLIANT — 11 ft maintained
Article VII, §2Single-family occupancy only✓ COMPLIANT
Article VII, §1No commercial use✓ COMPLIANT
Article VII, §4Written HOA/Declarant consent required⚠ ACTION REQUIRED
Article VII, §21Construction completed within 18 months✓ COMPLIANT — 18-month schedule
Article VII, §21No construction before 7 AM / after sunset; no SundaysContractor Obligation
Article VII, §23Trees ≥5" require Association approval to removeContractor Obligation
Article VII, §28Floor level min. 3 ft above max finished road heightStructural Obligation
Submission

Bid Instructions & Evaluation

Submission Requirements

  1. Company Profile: Bahamas licensing status, insurance capacity, key personnel credentials
  2. Relevant Experience: Portfolio of 3+ comparable luxury Bahamas residential projects (last 5 years)
  3. Detailed Cost Proposal: Itemized by CSI MasterFormat division with separate material & labor columns
  4. Proposed Schedule: Preliminary Gantt chart demonstrating 18-month timeline
  5. Legal Acknowledgment: Signed statement confirming acceptance of all legal framework requirements

Evaluation Criteria

Cost Competitiveness & Transparency
35%
Demonstrated Experience & Quality
25%
Schedule Viability & Resources
20%
Financial Stability & Insurance
10%
Value Engineering & Problem-Solving
10%
Get Started

Request Full Solicitation Package

This is a confidential solicitation. Complete the form below and acknowledge the NDA terms to receive the full design & construction solicitation package including all drawings, specifications, and bid documents.

Available Drawings

Drawing Set Preview

The following conceptual and schematic drawings are included in the full package. Licensed completion of six additional sheets is required.

Foundation plan Foundation Plan
Land survey Land Survey
Roof plan Roof Plan
Site plan Conceptual Site Plan